Repairs are being made to the CP main line and 9122 has asked for passage rights across CN's main line through the Lyn Valley.
 |
| CP 9122 preparing to leave the yard. |
 |
| Under way. |
 |
| Passing the tower and the locomotive repair facilities. |
 |
| Past the main office buiding and 9122 is almost ready to cross onto the main line. |
 |
| Through the crossover and onto the main line finally. |
 |
| Here 9122 is passing the Ethanol plant. |
 |
| The site of this abandoned cabin would make a great place for a railfans cottage! |
 |
| Lots of widlife to be seen along this stretch through the Lyn Valley. |
 |
| Not a lot of activity at Inukshuk Mining today. |
 |
| Crossing the trestle in front of Inukshuk Mining. |
 |
| Through the tunnel and onto another towering trestle. |
 |
| Prepaing to enter the snowshed at Cornelius Slide. |
 |
| The bridges never seem to end in this part of the country. |
 |
| Rumbling past Great Western Caboose Camping Adventures. This is a great spot for railfans who want to get away in a caboose for a week to do some camping, fishing and railfanning. |
No comments:
Post a Comment